Semarang-Demak Toll Road Section 1 Kaligawe-Sayung Construction Reaches 44.26% Completion

星期三, 18 六月 2025

The construction of the Semarang-Demak Toll Road Section 1 Kaligawe-Sayung with the total length of 10.64 kilometers continues and will be integrated with the Sea Wall or Giant Sea Wall (GSW) to overcome the tidal flooding that often occurs in Semarang and its surroundings. The Semarang-Demak Toll Road has the total length of 26.95 kilometers comprising two sections. The construction of Section 1 Kaligawe-Sayung lane above the sea level has reached 44.26% completion. Meanwhile, Section 2 of Sayung-Demak Lane with the total length of 16.31 kilometers has been operational since 25th February 2023.

返回新闻
©INFRAMAP - KNIGHTFRANK 2025