PT Puri Wahid Pratama, the owner of Cibinong City Mall (CCM) has appointed PT Adhi Persada Gedung (APG) as the main contractor to construct the CCM 2 project, specifically on its structure, architecture and piping. Cibinong City Mall 2 is designed to have five stories with the total of 50,000 square meters floor area and a parking building of 1,000-car capacity which also connected to the current Cibinong City Mall. The project is planned to be completed in Q4 2022.